Voron Repair Part 3: Removing Old Wiring

Today’s job was removing the old wiring harness and all the connections on the bottom of the machine that won’t be needed once the CAN toolhead is installed. The entire toolhead (part fan, heater fan, heater, LEDs, probe and stepper will all be connected to the toolhead PCB (Mellow Fly SB2040) and then to the main controller via CAN.

Underside with all unneeded connections removed.

Luckily everything else looks great and I don’t feel the need to do any cleanup/modifications except securing a few wires that were added while the machine was in it’s place. Now we wait for parts…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *